Page 1 Rapidswitch Data Centre Construction, internal works.

Page 2 Rapidswitch External works.

Initial inspection of premises to access suitability.
From this point plans are drawn up, negotiations with landlord and electricity supply companies begins.
Drawings sent to the council for planning permission and building regulations, as well as an energy conservation report detailing the efficiency of equipment used.

A mezzanine level was constructed to increase the floor area.
Photo showing the underside of the new mezzanine floor showing some of the steelwork, fire rated partitioning for the mezzanine emergency staircase and heavy grade computer room floor.

Mezzanine level floor showing installation of dry lining.
Also showing access hatch for ups room extract fan units.

CRAC unit installation.
Computer room nearing completion. Photo showing finished ceiling and floor, one of the computer room air conditioning units and the caged area for carrier room.

One of the air cooled UPS units.
Hot air is ducted into the ceiling void and exits via fan units.

Finished mezzanine level, showing floor, fire exit, computer room air conditioning CRAC units with red air aspiration pipe work.

Finished ground floor level.